To provide you with reliable and efficient service Tundra has a fleet of units capable of undertaking your environmental drilling projects.
Drill Unit
ASV PT80 Skid Steer with Drill Attachment (Rig #20)
- Length – 12’6” (3.8M)
- Width – 6’8” (2M)
- Height – 10’ (3M)
- Working Weight – 11,550lbs (5,239kg)
- Ground Pressure 4.5psi
- High Torque Drill Head
- 6” Solid Stem Augers to ~15m
- Compact to access tight areas
- Optional bucket for Snow Removal
Drill Unit
Morooka (Rig # 019) Track Mounted Environmental Drill
- Length – 19′ 7″ (5.97M)
- Width – 8′ 6″ (2.59M)
- Height – 18′ (5.5M) mast down; 26′ 3″ (8.0M) with mast extended
- Mast Stroke – 11′ (3.3M)
- 4.3 PSI Ground pressure
- 42,000 lbs (19051 kg) of pull back force
- Rubber tracked
- Solid and Hollow Stem up to 20M dependant on soil conditions
- Large deck for material storage
Drill Unit
AMS (Rig # 209) Environmental Power Probe
- Length – 16′ 3″ (4.95M)
- Width – 8′ 2″ (2.44M)
- Height – 9′ 2″ (2.8M0 mast down; 14′ 10″ (4.5M) mast extended
- Mast Stroke – 80” (2.05M)
- 48,000 lbs (21772 kg) of pull back force
- 34,000 lbs (15422 kg) of push down force
- Solid and Hollow Stem Augering up to 20M dependant on soil conditions
- Adjustable mast for angled probing & drilling
- 550 ft-lb S-22 hydraulic hammer with 1800 BPM
- 5000 ft-lb Hydraulic 2-speed auger motor
- Geo-probe DT325 tooling to produce a 2″ core sample